Case Studies/Data Center Decommissioning

An Austin decommission, right through SXSW

CSC had two weeks to hand back an 8,000 SF data center in original condition — during the week South by Southwest took over Austin. Quantum cleared it, sent nothing to landfill, and did the labor at no cost to CSC.

CSC data center decommissioning in Austin, Texas by Quantum Technology

Client
CSC
Location
Austin, Texas
Timeline
2 WeeksFull disconnect & removal
Result
No Cost to CSCPaid + all labor free

The Challenge

A hard deadline, during the busiest week in town

Quantum was referred to CSC, a global IT services company, to help with their 8,000 SF data center in Austin, Texas. Their lease had expired and the next-door tenant wanted to move into the space, so CSC was on the hook for removing all of the equipment and returning the suite to original condition.

The timing was brutal: the team’s window in Austin overlapped with South by Southwest. More than 28,000 visitors flooded the city, streets were blocked off, trucks struggled to get in — and the site had only a small dock that could fit straight trucks.

CSC data center in Austin before decommissioning

The Approach

Innovated around the gridlock

In just two weeks, Quantum fully disconnected the site’s Eaton UPSs and DataAire CRAC units, safely removed and recycled the lead-acid batteries, lifted all of the raised access flooring, and disconnected the remaining server cabinets and electrical infrastructure. To beat the festival gridlock and the small, straight-truck-only dock, the crew innovated a new loading technique that successfully navigated the city traffic and the loading limitations. Quantum paid CSC for the equipment and did all of the labor for free — and sent nothing to landfill, reselling or rehoming every asset.

ZeroSent to landfill

Everything was resold or rehomed — even raised-floor tiles with major cuts went to local residents for splash guards and flooring. As one put it: “a good product… very well-constructed.”

Scope of Work

The full suite, back to concrete

Everything removed down to the floor, in two weeks.

✓Eaton UPS systems disconnected
✓DataAire CRAC units removed
✓Lead-acid batteries safely removed & recycled
✓All raised access flooring lifted
✓Server cabinets & electrical infrastructure
✓Suite returned to original condition

In the client’s words

“They did a very thorough job of getting everything out… They worked well with the other contractor… There was good coordination. They stuck to their time schedule and were very quick to fulfill any financial obligations. They stuck to their word and I would use them again.”

Mark RanusCSC

The Outcome

On time, on budget, nothing wasted

A tight deadline met in a chaotic week — cleanly, and with zero landfill.

Original condition, no cost

The suite was handed back to original condition in two weeks — with Quantum paying CSC and doing all the labor for free.

Zero landfill, creative reuse

Every asset was resold or rehomed — even hard-to-reuse cut floor tiles found a second life with local residents.

Logistics, solved

A new loading technique got trucks in and out around SXSW crowds and a small, straight-truck-only dock.

Your project could be next

Tight deadline, tricky access?

We hit hard end-of-lease deadlines, work around real-world logistics, and keep materials out of the landfill — often at no cost to you.