A Reno data center cleared, down to the last window

When Renown Health bought a former Oracle data center in Reno, Quantum decommissioned it back to original condition — 3,516 SF of raised floor, 183 cabinets, and 40 ceiling air conditioners that had to come out through the second-floor windows.

Former Oracle data center decommissioning in Reno, Nevada by Quantum Technology

Client
Renown Health
Location
Reno, Nevada
Timeline
4 WeeksDecommission & removal
Result
Returned to OriginalReady for office use

The Challenge

From Oracle’s servers to a new owner

Quantum met with Matt Grimes of CBRE in December 2014 to inventory the old Oracle data center in Reno, Nevada. Matt’s goal was to sell the building or find a new tenant who would use the data center assets — and if no buyer or tenant materialized, he was prepared for Quantum to do a complete decommission and market the building as office space.

Within a few months, Renown Health purchased the property. Matt referred Quantum to Renown, and their general contractor, Lindsey York, sold Quantum the surplus assets and brought Quantum in to do the decommission and removal.

Inside the former Oracle data center in Reno

By the Numbers

What came out of the building

Raised Floor
3,516 SFPlus understructure
Cabinets
183Data cabinets
Ceiling ACs
40Liebert units
Transformers
14Plus switchgear

Removing equipment from the Oracle data center
The Approach

The hard parts: windows and rooftops

A December walk-through, several months before the project started, helped determine the scope and surface any unexpected conditions. Two of those conditions shaped the job: the 40 ceiling-mounted air conditioners had to be removed through the second-floor windows, so Quantum hired a window contractor to remove and replace the windows; and the roof-mounted condensing units had to come off by crane.

Quantum’s forklift- and telescopic-forklift-certified crews did the rigging and used a local crane company for the picks — with a pick plan submitted to the owner, insurance documents filed, and permits secured for road closures as needed.

40Ceiling ACs removed through the windows

The 40 ceiling-mounted air conditioners couldn’t go out the door — so Quantum removed and replaced the second-floor windows to get them out.

What We Removed

The full data center build-out

Everything down to the conduit beneath the floor.

✓3,516 SF raised floor, understructure, conduit & cable
✓183 data cabinets
✓7 Liebert CRAC units
✓4 roof-mounted condensing units (craned off)
✓40 ceiling Liebert air conditioners (via the windows)
✓14 transformers & 5 electrical switchgear lineups

The Outcome

Back to original, ready for its next tenant

A tricky removal, planned in advance and executed cleanly for the building’s new owner.

Returned to original condition

All of the equipment was disconnected and removed, bringing the space back to original condition for office use.

Tough removals, done right

Ceiling ACs came out through replaced windows and rooftop units by crane, with pick plans, permits and insurance in place.

Planned before it started

An early walk-through scoped the work and caught the conditions that made this job unusual — before a tool was lifted.

On Site

From the project

Oracle data center project photo
Oracle data center project photo
Oracle data center project photo
Oracle data center project photo
Oracle data center project photo
Oracle data center project photo
Oracle data center project photo
Oracle data center project photo

Your project could be next

Got a removal with no easy way out?

Windows, rooftops, tight access — we plan the picks, pull the permits and bring the rigging, so even the awkward equipment comes out clean.

Skills

Posted on

October 16, 2026

Submit a Comment

Your email address will not be published. Required fields are marked *