Quantum Technology Case Studies

DeSimone Construction – CPR

KEY FACTS

Location: Bristol, PA

Type: Building Demolition

Scope: Knock down the building. Clear the site of all debris. Level the ground and prepare it for planting grass.

Duration: 1 week

Client: DeSimone Construction for CPR

 

DeSimone Construction hired Quantum Technology to demolish a laboratory building in Bristol PA.  Besides doing equipment removal, electrical and mechanical disconnect and interior demolition of walls, floor and ceiling, the Quantum crew also does exterior and building demolition.  Contact us for your demo projects.  As usual, because we are an organization with a strong global resale arm, we are able to monetize items that a general demo contractor will send to landfill.  As a result, our prices for demo are usually much less expensive.

Project Details:
The crew checked for Asbestos or other hazards. In this case it was clean. Clear out all interior debris. Knocked down the building using mini excavator to shear the building. The debris was separated into brick and metal for recycling. Raked, placed top soil, seeded and placed hay on grounds.

Get in touch to discuss our tailored Building Demolition Packages.