Laboratory Decommissioning at Hartz by Quantum Technology

Case Studies/Laboratory Decommissioning

Relocating an entire Hartz laboratory — without missing a beat

When Hartz needed to move a full working laboratory to a new building in New Jersey, every instrument, refrigeration chamber, and casework unit had to arrive ready to run. Quantum planned the move around the science — and delivered it in two weeks with zero callbacks.

Hartz laboratory relocation by Quantum Technology

Client
Hartz
Location
New Jersey
Timeline
2 WeeksFull facility relocation
Result
Zero DowntimeEquipment back online immediately

The Challenge

A live lab that had to keep its science intact

Hartz was consolidating operations into a new building and needed its entire laboratory moved — not just boxed up, but relocated in working order. That meant coordinating technical instruments, lab furniture, countertops and casework, refrigeration units, consumables, and administrative equipment across two facilities with as little disruption as possible.

A move like this is unforgiving. Sensitive equipment can’t simply be loaded onto a truck; temperature-controlled units and precision instruments have tolerances that, once exceeded, can compromise months of work. The building itself had to be protected during the transfer and handed back to the landlord in inspection-ready condition. There was no room for guesswork — and no appetite for downtime.

Laboratory equipment prepared for relocation

Our Approach

Engineered around the equipment, executed after hours

Quantum’s crews built the move plan around the most fragile assets first. Before anything left the floor, our team coordinated directly with equipment manufacturers to confirm handling and temperature tolerances — so every unit could be powered back up and put straight into service the moment it landed at the new location.

To keep the client’s operations running, the heavy lifting happened at night, with Quantum crews working independently and without client personnel on site. Masonite floor protection was installed along every path of travel in both buildings, safeguarding finishes throughout the transfer and setting up a clean, inspection-ready handover.

Quantum Technology crew relocating laboratory equipment
6Refrigeration chambers

The most demanding part of the project was moving six refrigeration chambers — some weighing roughly 3,000 pounds each. Quantum rigged, transported, and reinstalled every one of them to manufacturer specification, so cold storage came back online immediately at the new building with no loss of contents or capability.

Scope of Work

Everything the move required, under one crew

From precision rigging to the final cleanout, Quantum handled the full scope in-house — no subcontractor handoffs, no gaps in accountability.

✓Equipment relocation and precision rigging
✓Lab furniture, countertops & casework moving
✓Refrigeration equipment transport & reinstallation
✓Manufacturer-spec tolerance coordination
✓Nighttime, unattended move operations
✓Masonite floor protection throughout
✓Full building cleanout to landlord specification
✓Inspection-ready handover for the next tenant

The Outcome

Moved, reinstalled, and signed off

The lab came back online at its new home on schedule — and the old space passed inspection the first time.

Zero callbacks

The relocation was completed cleanly, with no return trips required to correct or finish work after handover.

Immediate reactivation

Manufacturer-spec handling let every refrigeration chamber and instrument power back up and return to service right away.

Landlord approved

The vacated facility was fully cleaned out and passed landlord inspection, ready for the next tenant.

On Site

Inside the Hartz relocation

A look at the crews, rigging, and equipment that made the move happen.

Hartz laboratory relocation photoHartz laboratory relocation photoHartz laboratory relocation photoHartz laboratory relocation photoHartz laboratory relocation photoHartz laboratory relocation photo

Your project could be next

Planning a lab move or decommissioning?

Tell us about the facility and the equipment. We’ll build the move around your science, protect the space, and hand it back inspection-ready — on a timeline you can plan around.

Submit a Comment

Your email address will not be published. Required fields are marked *

Skills

Posted on

October 16, 2026